Name the spacing requirement
Copper-to-copper manufacturing spacing, electrical clearance, creepage and component courtyard spacing answer different questions. A fabricator minimum gap addresses a manufacturing process; it is not automatically a safe insulation distance for the finished product.
Clearance concerns the shortest path through air between conductive parts. Creepage concerns the path along an insulating surface. Component courtyard or assembly spacing concerns placement, soldering, inspection and mechanical access. Keep the applicable requirements separately identified in the CAD rules and drawings.
Determine the electrical design basis
Insulation requirements depend on the applicable product requirements and conditions such as voltage, insulation function, environment, altitude and material properties. The responsible product engineer should establish that basis before a numerical rule is assigned.
There is no universal IPC component-clearance value that resolves all electrical safety and assembly needs. Component package ratings also do not automatically qualify the surrounding board. Review the complete barrier, including pads, vias, connectors, mounting hardware and enclosure interfaces.
Evaluate slots, coatings and tolerances explicitly
A slot or coating can change aspects of the insulation construction, but its effect depends on the governing requirements and the actual geometry or qualified process. Ordinary solder mask should not be assumed to justify an arbitrary reduction in required separation.
Include dimensional tolerances, registration, exposed conductive features and potential assembly variation. A nominal CAD measurement can be larger than the minimum achieved in production. Review the worst relevant geometry rather than only the preferred view of the artwork.
Release requirements that can be inspected
Document critical distances, materials, slots and any qualified coating requirements on the controlled drawings. Agree the inspection and test evidence needed for fabrication, assembly and the finished product. A production electrical test is not a substitute for the complete insulation design assessment.
Keep the approval basis with the revision package. Material, component, enclosure or process changes can alter that basis and should receive an appropriate review. For a quotation, identify the critical requirements so the manufacturing proposal addresses them explicitly.