Separate inspection from functional verification
Visual and optical checks address visible assembly features. X-ray can support hidden-joint evaluation. Electrical and functional tests exercise different parts of the circuit. No single label establishes complete coverage.
Write measurable acceptance criteria
Identify the requirement, method, setup, expected result and pass/fail limit. Include test conditions such as firmware revision, supply settings, connections and sequence. Define how measurements and failures are recorded.
Design for the planned test
Review access to test points, fixture clearances, connector pinouts, programming interfaces and safe power sequencing before the board is released. Clarify responsibility for fixture design, test software and maintenance.
Plan first-article and production coverage
State which tests apply to every unit and which use a sampling plan. Identify the records required for first-article approval and whether production must wait for that approval. Any sampling decision should reflect your application’s risk and acceptance requirements.
Control changes and failures
Treat changes to firmware, components, board revision or test software as potential changes to coverage. Define failure handling, rework approval and retesting requirements. Keep the released test configuration with the manufacturing package.